以下为《关于生产区域施工事项的请示》的无排版文字预览,完整内容请下载
关于倍捻车间内施工事项的请示
Request for instructions on construction in twisting workshop
管道走向及位置
1、 Pipeline direction and location
因部分机电管线穿越生产区域,现就管线走向、标高及施工方法做如下说明:
Some pipes pass through the production area,the pipeline direction, elevation and construction method are described as follows:
a,管线走向:
a,Pipeline direction:
倍捻车间西侧,管道由水泵房沿内墙至改造区,管道安装在吊顶上。
The west side of the twisting workshop, the pipes are above the ceiling and from the pump room along the inner wall to the renov 内容过长,仅展示头部和尾部部分文字预览,全文请查看图片预览。 ked goods under the pipeline path need to be removed, and the construction needs a horizontal position of 1.8 ~ 2.0 meters.
c,正式进入施工前,请允***施工人员进入到倍捻车间勘查,以及使用脚手架等工具擦看吊顶内部情况。
c, Before construction, please allow our company's construction personnel to enter the twisting workshop for investigation, and use scaffolding and other tools to check the situation above the ceiling.
d,施工区域不能随意穿越,请所有人遵守。
d, The construction area can not be crossed at will, please obey.
[文章尾部最后300字内容到此结束,中间部分内容请查看底下的图片预览]请点击下方选择您需要的文档下载。
以上为《关于生产区域施工事项的请示》的无排版文字预览,完整内容请下载
关于生产区域施工事项的请示由用户“bruse86”分享发布,转载请注明出处